Skip to content
SWPPPBinder

Michigan Construction Stormwater

For Michigan construction sites disturbing 1 acre or more with a point-source stormwater discharge to waters of the state.

1 to under 5 acres
Automatic coverage with a Part 91 SESC permit; no NOC or state fee
5 acres or more
Notice of Coverage to EGLE with SESC permit, approved SESC plan, map, $400 fee
Inspections
Weekly and within 24 hours of a significant rain, by a certified operator
Governing plan
Part 91 Soil Erosion and Sedimentation Control (SESC) plan

We don’t sell Michigan binders

Michigan’s Permit-by-Rule is built on a Part 91 Soil Erosion and Sedimentation Control (SESC) permit and an SESC plan approved by your county or local agency, not on an EPA-style SWPPP. A SWPPP binder would not replace the plan Michigan asks for, so we would rather not charge you for one.

How Michigan coverage works

EGLE’s Water Resources Division issues construction stormwater coverage through Permit-by-Rule (Rule 2190 under Part 31 of NREPA). It depends on first obtaining Part 91 coverage: an SESC permit from the appropriate Part 91 agency, or designation as an Authorized Public Agency.

  • 1 to under 5 acres: coverage is automatic once you hold the Part 91 permit, but you must still follow Permit-by-Rule.
  • 5 acres or more: also submit a Notice of Coverage application to EGLE with a copy of the SESC permit, the approved SESC plan, a site location map and the $400 fee.
  • SESC measures must be inspected weekly and within 24 hours of a significant rain event by a certified construction stormwater operator.

What to do instead

Start with the Part 91 permitting agency for your project’s location; it sets the SESC plan and permit application requirements you must meet. Line up a certified construction stormwater operator for the weekly and post-rain inspections, and if you disturb 5 acres or more, budget for EGLE’s Notice of Coverage and $400 fee once your SESC plan is approved.

Our free permit checker on the home page still covers Michigan triggers and fees for planning.

Frequently asked questions

Do Michigan construction sites need a SWPPP?

Michigan's Permit-by-Rule relies on a Part 91 SESC permit and a county- or locally-approved SESC plan. EGLE's construction stormwater overview does not call for an EPA-style SWPPP.

When is the $400 Notice of Coverage required?

For sites disturbing 5 acres or more, along with the SESC permit, approved SESC plan and a site location map. Sites of 1 to under 5 acres are covered automatically once they hold a Part 91 permit.

Want Michigan SESC plans from us?

If enough Michigan contractors ask, we’ll build SESC plans the same way: fixed, tested rules and an editable file. Tell us your county and we’ll email you once, when it’s ready.

Email me when it’s available

Official sources

Last reviewed November 21, 2026. Summarized for planning; confirm current requirements with the permitting authority. This page is not legal or engineering advice.

Related