SWPPP Binder Checklist
Inspectors judge a site by its binder. Use this checklist to make sure yours holds everything a stormwater inspector expects to see.
The plan itself
- The complete SWPPP, with no template instructions or placeholders left in
- Site maps showing boundaries, disturbance areas, drainage, discharge points, controls, surface waters and wetlands
- Construction sequence and phase dates
- Signed certification (and, in Florida, every contractor’s signed FDEP certification)
Permit paperwork
- Your Notice of Intent and the authorization or acknowledgement you received
- Any delegation of authority letter for the person signing reports
- State or local permits that apply, for example New Hampshire’s Alteration of Terrain permit or Massachusetts’ Order of Conditions
Records that grow during the job
- Inspection reports, signed and dated
- Corrective action records
- Rain-gauge readings if you use a storm-triggered schedule
- Turbidity monitoring results if dewatering monitoring applies
- Training or certification records for inspectors and the stormwater team
- Every SWPPP modification, signed and dated
Screening documentation
- Endangered species screening (for example a USFWS IPaC printout) for EPA CGP sites
- Historic property screening documentation
How to organize the binder
Inspectors look for the same things in the same order, so a predictable layout saves time on every visit. A practical order:
- Front: permit coverage (NOI and authorization), the stormwater team and emergency contacts.
- The SWPPP with its site maps.
- Current inspection reports, newest first, followed by corrective action records.
- Logs: rain gauge, turbidity results, and SWPPP modifications.
- Appendices: training records, delegations, screening documentation and other permits.
Use tabbed dividers, keep a copy of the SWPPP in a waterproof sleeve at the posted site notice, and replace pages rather than writing over them so every change stays dated and signed.
How long to keep it
Keep records for the period your permit requires after coverage ends. Florida, for example, requires three years after final stabilization and the Notice of Termination (FDEP CGP Part 4.4). Check your permit for its retention period.
Frequently asked questions
Does the binder have to be on site?
Your permit sets where records are kept. Florida requires them at the site or at an alternative location named in the NOI. Keeping the binder on site makes inspections much smoother.
Build your SWPPP binder
Answer plain-English jobsite questions, upload your site plan, and download an editable Word file plus one bookmarked PDF. $299 per site, paid only after your binder passes the readiness check.
Official sources
Last reviewed November 21, 2026. Summarized for planning; confirm current requirements with the permitting authority. This page is not legal or engineering advice.